Xactimate Roof Estimates: 6 Items Insurers Commonly Leave Off

Quick answer: Xactimate and Symbility are accurate estimating tools when used correctly, but roof estimates often come up short because of how they’re set up and applied. The most commonly missed items are pipe boots and vent components, drip edge, valley metal, a realistic waste factor, steep-pitch tear-off labor, decking over spaced boards, and property protection. Each can be raised with photos, measurements, code references and manufacturer requirements.

If you’ve filed a property claim, your insurer probably used Xactimate or Symbility to calculate what it owes. These programs are industry standard, and on paper they’re fair. The problem is how they’re often used: by undertrained reviewers following internal guidelines that override real construction practice.

Are Xactimate and Symbility the Problem?

No. They were built for detailed, line-item estimating, and in experienced hands they produce accurate pricing. A hammer works great, unless someone uses it as a screwdriver. The issue is selective line items, adjusted settings and “that’s our guideline” answers nobody will explain.

Aerial view of synthetic underlayment and ice-and-water protection in the valleys during a Branson West area roof replacement
Step flashing, kickout flashing and masonry cut for counterflashing at a roof-to-wall intersection in Branson, MO

What Items Are Most Often Left Off a Roof Estimate?

Pipe Boots, Vents and Accessories

The common excuse is “no visible storm damage.” But many of these components have to come off to install a new roof, and reusing old, worn parts on a brand-new roof is a shortcut that invites leaks.

Waste Factor

Every valley, wall, chimney and cut line creates unusable shingle waste. Long-standing industry practice has been roughly 10% on simple gable roofs and around 15% on hip roofs. When waste is cut to 3% to 5%, the estimate assumes almost no offcuts, which isn’t realistic.

Steep-Pitch Tear-Off Labor

Steep roofs are slower and more dangerous to remove and install, requiring harnesses and extra care. Paying a steep charge for installation but not for removal doesn’t make sense. The roof didn’t get flatter during tear-off.

Decking Over Spaced Boards

Many older and rural homes have spaced plank decking. Shingle manufacturers and code generally require solid decking under asphalt shingles. If your policy includes ordinance or law coverage, this can be a significant item.

Drip Edge

Drip edge is thin metal that often bends during tear-off and is code-required in many areas. “No visible storm damage” isn’t a reason to reinstall mangled metal.

Property Protection

Tarps, plywood barriers and extra labor to protect landscaping, stonework and delicate areas are part of doing the job right, but often aren’t on the first estimate.

Synthetic underlayment installed on a steep roof section in Nixa, MO
New roof vents along the ridge of a replaced shingle roof in Bolivar, MO

How Do You Get Missing Items Reviewed?

Ask for the reason each item was omitted, in writing. Then have your contractor submit a documented roofing supplement with photos, measurements, code citations and manufacturer requirements.

New hip and ridge cap shingles on a roof replacement in Bolivar, MO
Finished shingle valley on a new roof in Bolivar, MO

Final Thought: “Industry Standard Software” Doesn’t Mean Fair

When someone points to the software as proof an estimate is right, ask what was left out and why. A tool is only as good as the person using it.

Frequently Asked Questions

What is Xactimate?

Xactimate is estimating software widely used by insurance adjusters and contractors to price property repairs line by line.

What waste factor should a roof estimate use?

It depends on roof complexity. Simple gable roofs often run around 10% and hip or cut-up roofs around 15%, based on measured roof geometry.

Why wasn’t drip edge included in my insurance estimate?

Insurers sometimes omit it if they don’t see storm damage. If it’s required by local code or damaged during tear-off, ask your roofer to document it.

Who can submit a supplement to my insurer?

Your contractor typically submits documentation of missed repair items. Bold Roofing provides documentation and estimates but does not negotiate claims.

Want a Second Set of Eyes on Your Estimate?

Call or text Bold Roofing. We’ll compare your roof’s actual needs with what’s on your estimate.

Call (417) 222-7535Text UsRequest an Inspection

Texting? Msg & data rates may apply. Reply STOP to opt out.

Mikel Miller

Recent Posts

Roof Insurance Claim Checklist: How to Protect Your Claim

A step-by-step roof insurance claim checklist: what to know before a storm, what to document…

2 hours ago

The Lowest Bid Lie: When a Cheap Roofing Quote Turns Costly

Why the cheapest roofing quote often leads to change orders and hidden costs, and what…

2 hours ago

How Storm Roofing Sales Reps Get Paid, and How to Vet Any Roofer

How door-to-door storm roofing reps are paid, what 'insurance claim expert' really means, and the…

2 hours ago

Why Your Home Insurance Rates Keep Going Up Even Without a Claim

Why homeowners insurance rates rise even if you never file, what Missouri rules say about…

2 hours ago

Why Your Insurance Agent Isn’t Your Claims Advocate

A former State Farm agent explains what agents do and don't do on roof claims,…

2 hours ago

Insurance Preferred Contractors: Why Your Insurer Wants You to Use Their Roofer

What an insurance preferred contractor is, what you may give up by using one, and…

2 hours ago